70 Ft. Bore.

Includes boring a hole 70 Ft. long under the existing concrete entyway of the building. The horizontal hole that we will create, will intersect each of various hole that have been predrilled into the concrete and measure approx. 16" in diameter. We will then install a continuous 1" sch. 40 conduit the full length of the bore beginning at the north retaining wall and intersecting each pre drilled hole. The Most Boring Company will be resposible for:

1) Digging the entrance and exit pits.

2) Making the hole and installing the conduit as described above.

Ace Construction & Maintenance will be responsible for:

1) Burying the trenches and replacing any vegetation.

2) Calling dig alert and accepting responsibility that there are no underground utilities          that might get in the way.